Tuesday, June 29, 2010

First Train...

There's always a certain thrill you get when the benchwork is in place, the roadbed is built and the track is all laid, and it's finally time to test the track. Last night, with the aid of some alligator clips and extension wires, I was able to run a train from the siding at Maryland Junction up the Thomas Subdivision almost to the Elkins Yard.



I've got a bit more wiring to do to make the switches on the sidings functional, and then lay all the industrial tracks at Thomas, which will give me the opportunity to run trains up and down the hill with purpose!

Anyway, I thought I'd share...

Saturday, June 26, 2010

A Little Help From My Friends

Phil Hoffman and the "Coon Ass Grass Master" ready to apply some detail to the river scene.

One of the things that I really enjoy about this hobby is the opportunity I have to share it with some really great people. I'm almost hesitant to refer to the railroad up in the attic as "my" layout, because so many people have had a hand in it. David K. Smith was kind enough to use his many talents to create the track plan based on a few sketchy notes that I provided him. Brian Fons and Jerry Britton both decided that my effort was worthy of a couple of sizable contributions of track and turnouts.

When I throw out a request for some oddball bit or piece, there always seems to be someone out there who's willing to help me out, either with an outright gift, or with a significant discount to help me over the hump. Anything from a $2 electrical connector to a loaner $2000 camera has been offered, and gratefully accepted.

Then there's the consultants... Ed Kapuscinski, Dave Foxx, John Berger, Steve Hanlon, and many others have all offered advice and suggestions that will help the layout look more realistic, operate more smoothly, and just generally be better.

As the reconstruction has progressed, it's the worker bees who have really kicked it into high gear, and helped me to really start bringing the project to life. Back in February, Phil Hoffman and Dave Foxx braved one of our notorious snow storms (a light dusting was predicted) to help get the west end staging yard built and installed.

And today, Dave, Brian Carhart, Tim Alder and Gary Hinshaw braved beach traffic and tropical heat to help me make a big push on building the lines that will one day let the Western Maryland Railway hustle those black diamonds and Alpha Jets around my attic. (Phil would have been here, too, but he's an oceanographer, and a Louisiana native, so he's been called down to deal with the big BP oil mess).

Not only do these guys take time away from their families and their own trains, they drive up to two hours to get here, they bring along tools, materials and even a few beers, and they do an absolutely fantastic job. (I'm proud to say that part of my installation was performed by a NASA engineer!) Then, if that weren't enough, they even take me out for lunch.

There are guys out there that declare themselves "Lone Wolf" model railroaders. To me, that's too bad. They're missing out on some really good times building, detailing and running their railroads with other guys who share their interest.

I'm glad to know that my enjoyment of the hobby is infectious enough to attract the caliber of people I've come to know as a result, and I'm especially looking forward to returning a LOT of favors!

Wednesday, June 23, 2010

Phase 2 Begins

Last night I re-wired the staging yard to account for the reverse loop. I still have to add a few drops, and the eastbound throat needs rebuilt, but we're not too far away from having the staging tuned up and ready to be buried. I test drove a 4 axle, then a 6 axle, then the big 4-8-4, and so far so good. The only problems that turned up were in the old section that I already knew about.

Next, this morning I rebuilt the area around Shaw. This is where the original section of the layout joined the temporary section, and the benchwork was a scabbed together mess. I needed to change the elevation, since the grade would be ascending here now, instead of descending as the temp loop had it. I also wanted to replace the subroadbed with proper 1/2" plywood, instead of the 1/4" paneling/3/4" foam sandwich I used originally. Here's what it was:
You can see pretty clearly that the engine is headed down grade. The point where the locomotive is in that picture is now about a full inch and a quarter higher than it was.


You can also see that I've made provision to add a Tortoise to run the siding at Shaw. There will be two short passing tracks on the Thomas sub, on either side of the scenic divider. Probably long enough to handle about 15 cars, or 20 55-T hoppers. I'm going to put the controls for both at the end of the peninsula so one tower operator can control movements on both sides. The switch into the truck dump at Shaw will remain manually operated by the train crew.


This shot reveals that the alignment will remain the same through the junction, just at a higher elevation.


The grade change has put the truss bridge at just about level. Compare this to the old view:

The bridge originally dropped about 3/8" from left to right, which was to accommodate the original track plan. I grew weary of having to adjust photos to compensate for the stiff grade, and I'm glad to be rid of it. Now I just have to build up the center pier, which now will have room for proper bridge feet.





Here's the track to the Shaw truck dump. I think I'm going to re-purpose this siding as a sand load out. There was a source for silica sand near Shaw that was shipped to PPG in Cumberland in two-bay covered hoppers... I sure have a lot of them, and this will put them to good use. I'll carefully relocate the truck dump over to Thomas on the other side of the peninsula. You can see in the picture that I filled the void left by the grade change with some HO scale ballast I have laying around. I use this a lot for filler. I just dump it through the track, brush it out so it's all below the ties, then apply my glue soup to it. Once it sets up, I go back over it with N scale ballast and scenic materials, and when it's done, it'll be nice and blended in.

I'll have to get some of those clip strips for the Tortoise here, because it's located smack dab over the staging yard, and there's no way I'll be able to wire it from underneath. This will also be the first pairing of machines that will get the decoder experiment. I'd also like to apply some simple signaling here. (open-green, closed red) probably as fascia indicators since the Thomas Sub was TO/TT territory. A working TO signal would be fun to have at Shaw, too, and this is where the lighted TO stand from Williamsport Jct. will likely end up.

I'm trying to get all the connection elevations set so when the crew comes down for a work day all the math is already done.

Sunday, June 20, 2010

Success!

My clean up effort was delayed until after dinner due to another project (for pay) that I had been procrastinating... but that got far enough along that I could grab the broom and dust pan and trudge up to tackle the Blob.
After about two hours of sorting, sifting and sweeping, I finally got to the point where I could turn around in the room without knocking anything over. Behold! The Floor exists! There's still a few piles of junk to go through, but they are now the exception rather than the rule. At least in the train room... The Blob lives on in the workshop area now...


Oh well... it may be on the move, but at least it's getting smaller. I figure in an evening's time, I can get all this crap sorted and either put away, or bundled off for the dust man. Either way, I can start plotting the next push on the benchwork now, and yes, sleep a little more peacefully!

Saturday, June 19, 2010

Panic! Finding a Way Out of Gridlock.



I spent a lovely, relaxing day on the Choptank River today, enjoying the company (and the boat) of a couple in our neighborhood who invited us out for a pre-Father's Day junket. The weather was perfect, the river calm, and the beer was cold. The best part was laying on the bench up in the boat's flying bridge and reading "Beautiful Swimmers" and drifting in an out of a breezy nap while the kids played in the water.

When I got home this evening, my thoughts turned once again to the action up in the train room. I opened the door, and was suddenly overcome with a sense of dread. The room is a disaster area. The bones of the old layout sections are everywhere, furniture is at all angles, and the floor looks like a hobby store walked into a hardware store, then blew itself up.

The re-construction project itself is moving along at a decent clip, and I even took the time to add the guard rails to the staging yard. Then I stepped back (not very far for fear of tripping on an extension cord or a pile of shipping peanuts), and pondered what the next move should be.

There's the helix on the Thomas Sub that needs to be A) connected to the rest of the layout, B) outfitted with some fiberglass screening to prevent cars from falling to the floor should something bad happen, or C) be enclosed in a masonite back drop, which would by necessity include a curved hatch that would allow easy access to reach the cars that are safely cradled in the screen safety net, again, should something bad happen in the twist.

Too complex a project to take on in my present state of mind. So that won't do. How about building the skyboard that will divide the peninsula? Well, I should finish building the peninsula first. So strike that.

There's a couple of wiring projects I could tackle. The big one will be to rewire the back half of the staging yard, which is now part of a big reverse loop, and therefore creates a dead short. This won't be too hard to do, but it will require crawling around under the layout, and I'm not wired for that just now...



As I stepped over a stack of old magazines that appeared out of nowhere, it dawned on me. Before I turn another screw, or cut another board, I have to clean the room up. I at least have to get it into some semblance of order. The chaos all around me is causing my whole thinking about the layout to be chaotic. So, there it is. That's my plan.

Tomorrow when I get home from church, I'm going to head up there and put the shoulder to the wheel. Last weekend Andy and I were able to wrestle his room from the grip of the junk monster, so now I have to do the same thing for myself. Otherwise I'll keep looking at the mountain in front of me, instead of building it!

Track!

Well, it's after 1 a.m. here in the east, and I'm just now emerging from the lab. We're supposed to go on a boat ride with the neighbors tomorrow, so I wanted to get some headway in before taking a nice break. I think my wife is actually looking forward to seeing me!

Anyway, here's tonight's... ahem... this morning's update:

I splurged and bought myself some cork and track so I could work on the staging loop. And work on the loop I did...





It turned out that between the new track I bought and the flex that I stripped from the
old yard, I had enough to close three of the loops! I need about 3 more pieces to finish the fourth. The hardest part was tying into the old staging tracks, because the connection is smack dab under the riverbed, and there's only about 3" clearance at that point. But thanks to some bent needle nose pliers, some yellow construction glue and a cleverly concocted clamp, all went smoothly.






That's right. A half-filled water bottle. What I did was schmear a bit of yellow glue on the cork, then carefully positioned the new piece of track, sliding the rail joiners into place with the pliers. Once I was confident I had it aligned properly, I'd roll the water bottle into place, wedging it between the track and the 1x2 joist that holds the river bed. Once the glue was set, I'd roll it out and do the next piece of track. This took quite a while to do all 8 tracks by this method... Once all the tracks were poking out into the open, I started making the alignments needed to get around the big bend.

Of course, the resultant triangle where the balloon comes together just begs for a little something...


I call this "The Loneliest Job on the Railroad"...

Well, the sheer magnitude of the accomplishment wasn't enough to satisfy me for the night, so I pulled out a box of loose freight cars to check the capacity of this new facility... I'm amazed at what we can now get away with...

The outer loop is long enough now to hold two 25 car trains. That's right. I've gone from barely being able to hold one train with 15 cars, to now being able to not only run longer trains, but more of them.



The picture actually shows two trains of 30 cars each, but this doesn't leave enough room for the three diesels each that would be required to lug the damn things up the twist to North Jct. But now you see why it was so important to fix that grade on the drop bridge! The best part is that the second train into the loop will have a visual cue when to stop to stay in the clear of the train ahead of it. I can make a cut out in the fascia right where the balloon reaches its widest point, and the engines of a 25 car train would need to stop when they appear in that window. Likewise, I'll put a lamp below decks so the operator can peek in and verify that the track ahead is clear, and if it is, he can proceed until he sees either his engines reach the overpass of the twist, or until his caboose is in the location shown in the photo above.


Ideally, I'd install some real detection, but given the continuing financial drama around my house, I'm glad to know that by dumb luck or design, I don't have to right away.


Oh, and for good measure, I pulled out a bunch of coal hoppers, too... Track three can handle two 25 car trains of 70 tonners with three diesels each with plenty of elbow room. With all this capacity, I can now dedicate two tracks to Lurgan trains, and two tracks to Baltimore trains. (Before I had a maximum of 4 tracks at about 16 cars to deal with all of it, because the West end had to stage in here, too.)

I figure the middle track can serve as the run through track, and during ops sessions, can be the destination of the Union Bridge local, which can now be a more realistic 20 car train with coal and cement hoppers, plus some covered hoppers and boxes for the other switches along the way.

So, now I have to re-wire the whole yard down there, because I just created a big old reverse loop. I have a circuit board to make it work, and I think what I'll do is make the outbound lead up the helix into the reversing section.

Next, I'm building the frame for the skyboard that will divide the peninsula.

See ya next time, same bat time, same bat channel...

Lee

Friday, June 18, 2010

Coming together...


I got to work on the layout some more last night, adding the sub roadbed for the staging yard, and installing the small helix to help the Thomas Sub reach the Elkins yard up on the top level (50").

Once I get the track laid in the staging yard, (and wired and tested...) I can start covering that area up. I've left ample access from below, so hopefully any "operator errors" will be able to be cleared from underneath.

The helix, well, that's another story. It's fairly tight, 24" x 30" at it's widest point, so it's a steep climb. I've already tested it, and a couple of diesels can pull a 20 car train of empty hoppers with reasonable dispatch. My Bachmann Consolidation steamer can also make the grade. Unfortunately, my K-2 Pacific can not... The tender binds on the engine cab.

Next time I get a decoder job on a Model Power Pacific I'll give that a whirl. Maybe there's another kitbash in my future.

Obviously, I won't be sending my 6-axle diesels and 89' pig flats up there... the Thomas Sub was known for coal and timber and short wheelbase engines grinding up steep, twisting rails. So even though it barely fits, the helix still fits. I'm hoping it adds to the operating interest of that part of the railroad. To make sure it doesn't detract from it, I'm working out a safety net made from fiberglass screening to make sure that any derailments in there don't ended up dropping 4' to the floor.